
Published Pricing · Arizona
What Things Cost
Real 2026 ranges for every service we build, and what moves each one. Most Arizona contractors won't put a number on a page. We think you deserve one before anyone walks your property.
In 2026, Redeemed Builders projects in Arizona run $75,000 to $500,000 for whole-home and luxury remodeling; $40,000 to $175,000 for kitchen remodeling; $20,000 to $90,000 for bathroom remodeling; $90,000 to $450,000 for home additions; $20,000 to $125,000 for custom decks and outdoor living; $25,000 to $150,000 for siding and exteriors; $6,500 to $95,000 for windows and doors; and $8,000 to $120,000 for finish carpentry and cabinetry. These are planning ranges, not quotes. Your written proposal is the number, and once signed it changes only if you change the scope.
Every service, with a real number
Eight services. Eight published ranges.
Side by side: 2026 Arizona ranges, cost levers and build time
| Service | 2026 range | What moves the number | Typical construction time |
|---|---|---|---|
| Whole-Home & Luxury Remodeling | $75,000 to $500,000 | Driven mostly by how much of the layout, structure and plumbing you change. | 4 to 8 months of construction |
| Kitchen Remodeling | $40,000 to $175,000 | Keeping the sink, range and fridge where they are is the biggest saving. | 8 to 12 weeks |
| Bathroom Remodeling | $20,000 to $90,000 | Every shower gets a custom pan; moving drains is what moves the price. | 4 to 8 weeks |
| Home Additions | $90,000 to $450,000 | Roughly $325 to $550 per square foot, higher when it includes a bath or kitchen. | 4 to 8 months of construction |
| Custom Decks & Outdoor Living | $20,000 to $125,000 | About $65 to $140 per square foot for composite; height off the ground matters most. | 2 to 6 weeks |
| Siding & Exteriors | $25,000 to $150,000 | James Hardie runs about $14 to $28 per square foot of wall, accent or full wrap. | 2 to 6 weeks |
| Windows & Doors | $6,500 to $95,000 | Custom wood entry doors $8,500 to $25,000; whole-home windows $25,000 to $95,000. | 1 to 3 weeks on site |
| Finish Carpentry & Cabinetry | $8,000 to $120,000 | From a single built-in to whole-house trim, ceilings and custom cabinetry. | 1 to 6 weeks |
Why we publish it
Count the cost before you build.
Jesus told the story of a builder who sat down first and counted the cost, so he would not lay a foundation he could not finish. We think every homeowner deserves the same chance. These ranges come from real Arizona projects and current material pricing, and they are the same numbers Torin uses when he gives you a ballpark on the phone.
A range is not a quote. Your written proposal is the number, in Good, Better and Redeemed tiers, and once you sign it, it changes only if you change the scope.
“For which of you, desiring to build a tower, does not first sit down and count the cost, whether he has enough to complete it?”
Where does your project land?
Run an instant estimate, or send a few details and get an honest ballpark from Torin.
The ranges on this page are 2026 planning ranges for Arizona projects, drawn from the kind of work we build in the Phoenix Valley and Northern Arizona. They are not quotes. Your project's real number is the one in your written proposal, after Torin has walked the site and you have chosen a tier. That proposal is one quote, one time: the price changes only if you change the scope.
Last updated October 2026 · Written and reviewed by Torin Stansbury, owner of Redeemed Builders · Licensed Arizona KB-1 General Contractor, AZ ROC #365545