What a Whole-Home Remodel Costs in Arizona

Whole-Home Remodeling Pricing · Arizona

What a Whole-Home Remodel Costs in Arizona

Real planning ranges from a licensed Arizona builder who works in the Valley and up north. Not a national average, and not a number designed to get you on the phone.

What our remodel projects run

$75,000 to $500,000

Most of our whole-home remodels start around $75,000.

Below that, the project is usually one or two rooms, not the whole house. That is still work we do, and our kitchen, bath and carpentry pages show what it costs.

The short version

A whole-home remodel with Redeemed Builders typically costs $75,000 to $500,000 in Arizona. Surface-level work in an existing layout sits near the bottom. Moving walls, relocating plumbing, rebuilding the primary suite and adding custom millwork pushes toward the top. The single biggest lever is how much of the house's structure and systems you change.

Why we published this

The decision that moves the number most: bones or surfaces

Every whole-home remodel sits somewhere between two poles. At one end, the walls, plumbing and electrical stay where they are, and you replace everything you can see: cabinets, counters, tile, flooring, trim, paint and fixtures. At the other end, the house gets re-planned. Walls come out, beams go in, the kitchen moves across the room and the primary bath gets rebuilt from the slab up.

The second kind of project can easily cost two or three times the first, even with identical finishes. Structure needs engineering. Moved plumbing means cutting slab. Moved electrical means new circuits and often a panel upgrade. Every one of those adds inspections and schedule.

Neither one is the right answer for everybody. But knowing where your plan sits on that line tells you more about your budget than any finish you pick. It is the first thing we talk through at the site walk.

What that means for you
Surfaces only
Kitchen, baths, floors and trim replaced in the existing layout. The lower end of the range.
Targeted moves
One or two walls opened, one key room re-planned. Usually the middle.
Full re-plan
Structure, plumbing and electrical reworked throughout. The upper end.
Finish level
Matters, but it moves the number less than the plan does.

What moves the number

What actually drives the price

Six things move a whole-home remodel more than anything else. Understand these and you understand most of the number.

Layout changes

Moving or removing walls brings engineering, beams, permits and patching across floors and ceilings. It is the single biggest variable, and the one worth deciding first.

Plumbing relocation

Most Arizona homes sit on a slab, so moving a sink, toilet or shower means cutting concrete, trenching and re-pouring. Keeping wet walls in place saves real money.

Electrical and HVAC

Older homes often need a panel upgrade, new circuits or rebalanced ductwork to carry a modern kitchen and lighting plan. It is invisible, and it adds up.

How many rooms

A remodel that touches the kitchen, two baths and the floors is a different project from one that touches every room. Scope sets the size of the crew and the schedule.

Finish level

Cabinetry, stone, tile, flooring and fixtures can each vary by a factor of three. Repeated across a whole house, those choices move the total significantly.

Approvals and site

HOA design review, Paradise Valley hillside rules or Sedona design review add time and drawings. Tight access or hillside lots add labor and equipment.

Placing your project

Where your project lands in that range

Rather than pretend every house fits a neat package, here is how real projects move through the range.

Toward the lower end

Toward the lower end

Roughly $75,000 to $150,000. The layout stays. A new kitchen in its existing footprint, refreshed hall and primary baths, new flooring through the main living areas, interior doors, trim and paint. The house feels new without moving a wall.

Through the middle

Through the middle

Roughly $150,000 to $300,000. A kitchen opened to the great room with a new beam, a rebuilt primary suite with a custom shower, new flooring throughout, upgraded lighting and a finish carpentry package. This is where many of our projects land.

At the upper end

At the upper end

Roughly $300,000 to $500,000. A full re-plan: relocated kitchen and baths, structural changes, new electrical service, custom cabinetry and millwork in most rooms, wood ceilings and designer finishes, often in a Paradise Valley, Scottsdale or Sedona home with design review.

Bringing it down

What lowers the cost

If the number is higher than you hoped, these are the honest levers. We will walk through them with you before you walk away.

Keep the wet walls

Leave kitchen and bath plumbing roughly where it is. It is the most reliable saving on any remodel.

Phase the work

Do the kitchen and main living areas now and the secondary baths next year, under one plan so nothing gets torn out twice.

Spend where you touch

Put the budget into cabinets, counters and hardware you use daily, and choose simpler finishes for secondary rooms.

Decide early

Choosing finishes before we start avoids rush orders and schedule delays, which are where budgets quietly leak.

Move out if it makes sense

An empty house builds faster. Faster means fewer crew days, and crew days are a big part of the price.

Use the Good tier where it fits

Your proposal shows Good, Better and Redeemed options. Mixing tiers room by room is often the smartest budget.

What to expect

Permits, lead times and living through it

Permits and approvals. Layout, structural, plumbing and electrical changes all need city or county permits. Scottsdale, Phoenix and Paradise Valley each have their own review timelines, and HOAs and Sedona add design review. We handle the drawings, submittals and inspections.

Lead times. Custom cabinetry, windows and specialty tile can take eight to sixteen weeks. We order long-lead items before demo so the house is not sitting open waiting on a truck.

Disruption. A whole-home remodel is noisy and dusty, and summer work starts early to beat the heat. Many families move out for the heaviest phase. You get a morning update every working day either way.

How we work
Free ballpark, free site walk, free written proposal
Good, Better and Redeemed tiers, fixed scope and price
Material deposits paid straight to the supplier
A morning update every working day

Questions

Remodel Cost, Questions Answered

What does a whole-home remodel cost in Arizona?

Our whole-home remodels run $75,000 to $500,000. Where yours lands depends mostly on how much of the layout, structure and plumbing you change, then on finish level and the number of rooms involved.

What is the cost per square foot for a whole-home remodel?

Per-square-foot figures are misleading for remodels, because a kitchen costs many times more per foot than a bedroom. As a rough guide, surface-level whole-home work often lands in the $60 to $120 per square foot range, and full re-plans go well beyond that. We would rather price your actual rooms.

Is it cheaper to remodel or build new?

Almost always cheaper to remodel, because you keep the foundation, framing, roof and much of the infrastructure. A full re-plan can approach new-construction cost per foot, but you also keep your lot, your location and your neighborhood.

How much should I set aside for surprises?

We recommend holding 10 to 15 percent in reserve on older homes. Your price does not change unless the scope changes, but hidden conditions like rotted framing or old galvanized plumbing are real, and if we find one we show you and price it in writing before any work happens.

Can I live in the house during the remodel?

Sometimes: if we phase the work and you keep a bathroom and some kitchen access, many families stay. When the kitchen, baths and floors are all torn up at once, moving out for part of the build is safer and usually faster.

Why do you publish ranges when most contractors will not?

Because you should know whether a project is in reach before you spend an afternoon on a site walk. Luke 14:28 says to count the cost before you build. We would rather help you do that up front than surprise you later.

How does your pricing work?

You get a free ballpark by phone, a free site walk, and then a written proposal with Good, Better and Redeemed options at fixed prices. Once you sign, that is the number. One quote, one time. It changes only if you change the scope.

Where does my deposit go?

Your material deposit is paid straight to the supplier, and you get the receipt. It goes to your cabinets, windows and lumber, not into anyone's operating account. Read how that works →

Find out what your remodel project would cost.

Tell us what you want built. Torin will give you an honest range and tell you where the money is best spent.

The ranges on this page are 2026 planning ranges for Arizona projects, drawn from the kind of work we build in the Phoenix Valley and Northern Arizona. They are not quotes. Your project's real number is the one in your written proposal, after Torin has walked the site and you have chosen a tier. That proposal is one quote, one time: the price changes only if you change the scope.

Last updated October 2026 · Written and reviewed by Torin Stansbury, owner of Redeemed Builders · Licensed Arizona KB-1 General Contractor, AZ ROC #365545