Services
Whole-Home & Luxury RemodelingKitchen RemodelingBathroom RemodelingHome AdditionsCustom Decks & Outdoor LivingSiding & ExteriorsWindows & DoorsFinish Carpentry & CabinetryPermanent Lighting
Pricing Portfolio Learning Center
Start HereProject CostsContractor ReviewsArizona Deck GuideBuilding From Your PlansRemodeling FAQRemodeling Blog
Areas We Serve Contact About
Meet TorinOur ProcessCore ValuesJoin the TeamRedeemed Referral ProgramDesign Partner Program
Call (928) 277-5499
What a Kitchen Remodel Costs in Arizona

Kitchen Remodeling Pricing · Arizona

What a Kitchen Remodel Costs in Arizona

Real planning ranges for kitchens in the Valley and Northern Arizona, plus the one decision that moves the number more than any finish you pick.

What our kitchen projects run

$40,000 to $175,000

Most of our kitchen remodels start around $40,000.

That is a full remodel: new cabinets, counters, backsplash, plumbing fixtures and lighting, installed by our own crew. We do not do cabinet-paint-and-new-knobs jobs, and we would rather say so here.

The short version

A kitchen remodel with Redeemed Builders typically costs $40,000 to $175,000 in Arizona. Keeping the existing layout with semi-custom cabinets and quartz sits near the lower end. Opening walls, moving plumbing, custom cabinetry and professional appliances push toward the top. The biggest single lever is whether the sink, range and refrigerator stay where they are.

Why we published this

The decision that moves the number most: keep the layout, or move it

The sink, the range and the refrigerator are tied to plumbing, gas, venting and heavy electrical. When they stay roughly where they are, your remodel is mostly about what you see: cabinets, counters, tile, lighting and appliances.

When they move, the project changes character. On a slab, moving a sink means cutting concrete and re-routing drains. Moving a gas range means a new gas line and new hood venting. An island with a sink or cooktop brings plumbing and power up through the floor.

Sometimes moving things is absolutely worth it, especially in older Valley homes with closed-off galley kitchens. But it is the decision to make first, because it shapes the budget more than any countertop.

What that means for you
Keep the layout
The most budget-friendly path. New everything, same locations.
Move one or two things
A relocated range or a bigger island. A meaningful step up.
Full re-plan
Walls, plumbing, gas and electrical all reworked. The top of the range.
Try it yourself
Our kitchen estimator shows how each choice moves the number.

What moves the number

What actually drives the price

Six things move a kitchen remodel more than anything else. Know these and you can read any kitchen estimate.

Layout

Keeping the sink, range and refrigerator in place is the single biggest saving. Moving them adds plumbing, gas and electrical work, often through a concrete slab.

Cabinetry

Usually the largest line in the budget. Semi-custom looks excellent in most kitchens. Full custom earns its cost in unusual layouts, tall ceilings and specialty storage.

Walls

Opening a kitchen to the living space is a common request. A non-bearing wall is modest. A load-bearing wall needs an engineered beam, a permit and more patching.

Countertops

Quartz and granite are the most predictable. Quartzite and marble cost more to buy and fabricate, and waterfall or mitered edges add labor.

Appliances

One of the widest swings in the room. A professional range, built-in refrigerator and dedicated hood can add more than the counters and backsplash together.

Size and ceiling height

More linear feet of cabinets means more of everything. Tall Valley ceilings often call for stacked uppers or extended crown.

Placing your project

Where your project lands in that range

Here is how real kitchens move through the range. Most land somewhere in the middle.

Toward the lower end

Toward the lower end

Roughly $40,000 to $65,000. The layout stays. New semi-custom cabinets, quartz counters, tile backsplash, new sink and faucet, under-cabinet lighting and new flooring in a mid-sized kitchen, with your current appliances or a mid-range package.

Through the middle

Through the middle

Roughly $65,000 to $110,000. A larger island, one or two relocations, a non-bearing wall opened, upgraded cabinetry with pull-outs and organizers, a fuller lighting plan and new mid-to-upper appliances.

At the upper end

At the upper end

Roughly $110,000 to $175,000. A re-planned kitchen with a load-bearing wall removed, full custom cabinetry to the ceiling, quartzite or marble, a professional appliance package and finish carpentry details like beams or paneled ends.

Bringing it down

What lowers the cost

If the number is higher than you hoped, these are honest ways to bring it down without building a kitchen you will regret.

Keep the footprint

Leave the sink, range and refrigerator where they are. It is the biggest single saving in the room.

Go semi-custom

In a straightforward layout, quality semi-custom cabinets installed well look as good as custom.

Choose quartz

It performs well, prices predictably and needs no sealing. Save the quartzite for an island top if you want it.

Keep good appliances

If your appliances are newer and work well, keeping them can free up thousands for cabinets or counters.

Mix the tiers

Choose the Redeemed tier on the island and cabinetry, and the Good tier on items you rarely notice.

Decide before demo

Finishes chosen before we start mean no rush orders and no crew waiting on decisions.

What to expect

Permits, lead times and living through it

Permits. Moving plumbing, gas or walls, or adding circuits, needs a permit in every Valley city and in Yavapai and Coconino counties. Cosmetic swaps often do not. We tell you which applies and handle it.

Lead times. Semi-custom cabinets typically take four to eight weeks, custom often longer, and stone is templated after cabinets are set. We order early so demo happens when materials are close.

Disruption. Plan on eight to twelve weeks without a full kitchen. We help you set up a temporary kitchen, protect the rest of the house from dust, and send a morning update every working day.

How we work
Free ballpark, free site walk, free written proposal
Good, Better and Redeemed tiers, fixed scope and price
Material deposits paid straight to the supplier
A morning update every working day

Questions

Kitchen Cost, Questions Answered

How much does a kitchen remodel cost in Arizona?

Our kitchen remodels run $40,000 to $175,000. Layout, cabinetry, appliances and countertop choice account for most of the difference between one kitchen and the next.

What is the biggest cost in a kitchen remodel?

Cabinetry is usually the largest single line, often a third or more of the budget. Layout changes are the biggest swing, because they bring plumbing, gas and electrical work along with them.

How much does it cost to remove a wall to open a kitchen?

A non-bearing wall is a modest addition to the project. A load-bearing wall needs an engineered beam, a permit, temporary shoring and more drywall and flooring patching, and it often adds $15,000 or more. We check the structure at the site walk.

Is quartz or granite cheaper?

They are often close: quartz is consistent and needs no sealing. Granite varies by slab. Quartzite and marble cost noticeably more in both material and fabrication.

Can I keep my appliances to save money?

Yes, if they fit the new cabinet plan and are in good shape. It is one of the simplest savings available. We confirm dimensions before cabinets are ordered.

How long does a kitchen remodel take?

Most of our kitchens take eight to twelve weeks of construction, after design and ordering. Custom cabinetry and structural changes sit toward the longer end.

Does a kitchen remodel add value to my home?

A well-built kitchen is one of the rooms buyers notice most. We do not promise a specific return, because every market and house is different. Build it to serve your family well and to the standard of your neighborhood.

How do I get my own number?

Use our kitchen estimator for a ballpark, then call for a free phone ballpark and site walk. You will get a written Good, Better and Redeemed proposal at fixed prices.

Find out what your kitchen project would cost.

Tell us what you want built. Torin will give you an honest range and tell you where the money is best spent.

The ranges on this page are 2026 planning ranges for Arizona projects, drawn from the kind of work we build in the Phoenix Valley and Northern Arizona. They are not quotes. Your project's real number is the one in your written proposal, after Torin has walked the site and you have chosen a tier. That proposal is one quote, one time: the price changes only if you change the scope.

Last updated October 2026 · Written and reviewed by Torin Stansbury, owner of Redeemed Builders · Licensed Arizona KB-1 General Contractor, AZ ROC #365545